To enable us to inspect the key stages of the building work, you will need to notify building control services when you start work then at certain stages.
When your Building Control Surveyor reviews your application, an Inspection Notification Plan (INP) will be prepared, based on the design proposals of the work you intend to carry out. The INP will be the minimum notifications anticipated, although further visits may be carried out as the work progresses on site. The INP will also specify additional information that will be required on completion.
In the case of a Full Plans application, the INP will be sent to you with the approval.
For Building Notice applications, an INP will be sent with the acceptance of the application although this may need to be revised due to the possible lack of details at this stage.
Once the work starts on site, a copy of the INP will be given to your builder.
If you don't keep us up to date on your progress, you might have to open up works so that we can check it. This takes time and can cost you money, so to avoid having to do this, please keep your Building Control Surveyor fully informed.
You can request an inspection through this website using the link below.
We will make every effort to carry out inspections without delay to keep your building work moving.
Requests received before 9.30am are carried out on the same day. Requests received after 9.30am may still be carried out on the same day. If this is not possible, we will inspect on the next working day.
Prior arrangements can be made with your Building Control Surveyor.
Building work covered without notice being given is a contravention of building regulations and we may need such work to be exposed.
South Derbyshire District Council
Building Control Services
Civic Offices
Civic Way
Swadlincote
Derbyshire
DE11 0AH
Tel: 01283 228757
Fax: 01283 595850
Online: Request an Inspection
email: building.control@south-derbys.gov.uk
Page ref: SDDC 331